Edgebrook Overview
Delplant was responsible for the construction of:
- Internal sewer, water (potable & recycled) and gas pipelines and structures across multiple stages.
- Eliston Branch Sewer – 1.75km 300mm pipeline comprising of both open cut and laser boring in depths ranging from 3 to 7 metres. The delivery of the $1,400,000 branch sewer included construction of 25 manholes and 1 gas check manhole.
Share this Project